Scottish Corridor campaign mission 1 - 9th Cameronians C and D Companies attack the
small hamlet of le Haut du Bosq.
Included with the campaign
Battle Type: | Allied Attack | Date: | 1944/06/26 |
Time: | Day 08:25 | Length: | 01:00 |
Size: | Medium | ||
Map Size: | w: 480 m d: 800 m | Area: | 0.384 Sq. km |
Region: | France | Terrain: | Open |
Weather: | Light Fog and Rain and Warm | Ground Conditions: | Muddy |
Early Intel: | Neither | theBlitz Size Modifier: | 6 |